Software for water pipeline contractors
Every metre of pipe, accounted for
Put the drawing on the map. Mark pipe laid from the phone. Know what is in each store and what each stretch cost.

Your drawing becomes the map
Upload the network as DWG, DXF or KMZ and pick the pipe layer. infra.ai lays it on the map in 5 m pieces, ready to track. One zone holds up to 150,000 pieces, so a whole town fits.
DWG, DXF and KMZ today. More formats are coming.
Mark progress where the pipe is
11,420 m of 18,420 m laid
Pipe laidTrench excavated
On site, tap the start and the end of the stretch. Pick the status your company uses.
Type length, width and depth once. Excavation, refilling and disposal work out by themselves, from formulas you set.
A DPR nobody has to write
The supervisor says what went in and what was used. The form shows today's length, the month so far and the total against target before he sends it.
What the AI does
Terra fills the DPR and the materials list from speech, store by store, and asks if an item is unclear.
Spoken: ಇವತ್ತು Zone 1 ಅಲ್ಲಿ 300 mm DI pipe ನೂರಿಪ್ಪತ್ತು ಮೀಟರ್ ಹಾಕಿದ್ವಿ. Navalgund store ಇಂದ pipe ನೂರಿಪ್ಪತ್ತು ಮೀಟರ್, cement ಆರು bag ಹೋಗಿದೆ.Kannada

Pipes, valves and specials in every store
One list for every yard and site store, with low and empty marks, and a history of who moved what.
What the AI does
Say what arrived. The agent prepares the change and the count updates on Yes.
Spoken: Add fifty bags of cement at Navalgund site store.English
From the bill at the trench to the bank
Petty cash, hire charges and site purchases are read, checked and approved the same day.
Approved because the bill, amount and date match and it is inside the ₹5,000 limit.
₹14,300 approved and not paid, minus the ₹10,000 advance Suresh still has.
Backup for the RA bill, when you ask
Ask for this month's DPR by person, zone or diameter and get an Excel. Ask for the June RA bill and get it back with a one-page summary on your letterhead. Export a PDF atlas of the whole network, or the drawing with progress as DWG.
RA Bill 02 covers work up to 30 June 2026. This bill is ₹31,25,400; gross to date is ₹86,40,000.
RA Bill 02, June 2026.pdf, page 1RA Bill 02 covers work up to 30 June 2026. This bill is ₹31,25,400; gross to date is ₹86,40,000.
RA Bill 02, June 2026.pdf, page 1Set up for water work
This is how infra.ai for Water Pipeline arrives. Your team can change every line.
- Map statuses
- Not started
- Work started
- Trench excavated
- Pipe laid
- Hydro test passed
- Road restored
- Forms
- Pipe laying DPR, Materials inward, Material used, Hydro test record, Material request
- Units and items
- RMT, NOS, BAG, cum. DI and HDPE pipe by diameter and class, valves, specials, gaskets
- Formulas
- Excavation = length x width x depth. Refilling = excavation less pipe volume and bedding. Disposal = excavation less refilling.
The platform is ₹4,999 a month. The complete suite is ₹599 per office user and ₹99 per field user, billed yearly, before GST.
See pricingSee it on a job like yours
Tell us what you build. We will show infra.ai on that kind of work, in Kannada, Hindi or English.