Site Vector Technologies, home
Book a demo

One platform, set up for your trade

The modules are the same in every product. The statuses, forms, materials and reports are set for the work you do.

Workers lower a blue pipe into a trench on slings.
Live

infra.ai for Water Pipeline

For contractors laying DI, HDPE and sewer lines. Upload the network drawing and track pipe laid in 5 m pieces. Count pipes, valves and specials in every store. Keep the DPR, the bills and the RA bill backup in one place.

See the product
A paver lays fresh asphalt on a highway while workers follow behind.
Live

infra.ai for Road

For contractors building and resurfacing roads. Track milling, tack coat, DBM, BC and marking by chainage. Count bitumen, emulsion and aggregate at the camp and the plant. Tie plant, labour and petty cash bills to the stretch.

See the product

Next

infra.ai for Civil

Coming soon

For structures, drains, culverts and site development. Pour registers, bar bending schedules and cube test records are planned.

Tell me when it is live

infra.ai for Plumbing

Coming soon

For plumbing contractors on buildings and campuses. Risers, fixtures and pressure tests, floor by floor.

Tell me when it is live

infra.ai for Building & Construction

Coming soon

For builders. Slab cycles, finishing checklists and handover snags, tower by tower.

Tell me when it is live

infra.ai for Electrical

Coming soon

For electrical contractors. Cable schedules, panel erection and megger test records.

Tell me when it is live

The same modules in every product

Terra AI
Terra Master and an agent in every module, by voice or text.
On site
Projects on the map, any form or DPR, a phone app that works offline.
Stores
Stock at every store and moves between them.
Money
Expenses, AI bill checks, approvals, advances and payouts.
People
Check-in, live tracking, attendance, leave and pay.
Office
Files, tasks and reports.
Company chat and control
Infragram for the team, Configuration for the rules.

What changes for your trade

Map statuses

Water PipelineWork started, Trench excavated, Pipe laid, Hydro test passed, Road restored

RoadMilling done, Tack coat, DBM laid, BC laid, Marking done

Progress measured in

Water PipelineMetres of pipe by diameter, zone by zone

RoadLength by chainage, area and mix tonnage, side by side

Daily report

Water PipelinePipe laying DPR, materials inward, hydro test record

RoadLayer DPR, plant and machinery log, bitumen and aggregate issue

Stock

Water PipelineDI and HDPE pipe, valves, specials, gaskets, cement

RoadBitumen, emulsion, aggregate, GSB, marking paint, diesel

Drawings

Water PipelineNetwork DWG or KMZ, cut into 5 m pieces

RoadAlignment KMZ or strip plan DWG, cut into 5 m pieces

These are starting points. Each one is a setting you can change.

See it on a job like yours

Tell us what you build. We will show infra.ai on that kind of work, in Kannada, Hindi or English.